Lean Management glossaryLean glossary

Lean Management terms explained simply, with what they change on the ground. This glossary accompanies the nomuri solutions.

Muda 無駄
Waste: any activity that uses resources without creating value for the customer (waiting, transport, inventory, rework…).
Mura 斑
Unevenness in workload: successive peaks and troughs. Mura often causes muri during the peaks.
Muri 無理
Overload: asking a person or a machine for more than they can reasonably give. It is what nomuri targets. Read the concept
Takt time
The pace needed to keep up with demand: available time divided by customer demand. A station whose workload exceeds takt is overloaded.
Yamazumi chart 山積み
“Stacked up” in Japanese. A bar chart that stacks each station’s tasks and compares them with takt time.
Line balancing
Spreading tasks across stations so that each one works under takt, with no bottleneck or overload. You can practise it with Manufacture Enème.
Heijunka 平準化
Levelling production or workload over time to remove mura and peaks of overload.
Kaizen 改善
Continuous improvement in small steps, led by the teams themselves.
Andon 行灯
A signal that flags a problem immediately so that help arrives. In Kareko, andon is the last level of response to understaffing.
PDCA
Plan, Do, Check, Act: Deming’s cycle for problem-solving and improvement. Lean Sensei guides each step.
5 Whys
Asking “why?” several times in a row to trace a symptom back to its root cause.
Ishikawa diagram
A fishbone diagram that sorts the possible causes of a problem (methods, people, materials, machines, environment…).
Skill mix
The spread of qualifications within a care team (ICUS, IDE, ASSC, AUX…). Kareko checks the quotas by role on every shift.
Kamishibai 紙芝居
A visual audit card system that ensures standards are checked regularly on the floor.

All solutions Concept & origins